Performance Solutions LLC

Index

They are a steel fabricator based in Tennessee. They manufacture structural steel and stairs. With staff members possessing over 45 years of industry experience, they also supply steel decking and a variety of structural steel inventory (such as W, C, L, FB, and MC shapes).

Performance Solutions LLC Official Capture
Image source: Performance Solutions LLC Official Website
(https://perfsolutions.com/)

What Kind of Stair Manufacturer is Performance Solutions LLC?

Precision Fabrication Utilizing Certified Welders and Peddinghaus CNC Equipment

They employ certified welders and handle steel fabrication utilizing CNC equipment. Additionally, they are equipped with a large Peddinghaus horizontal band saw, enabling them to cut materials to precise, specified dimensions.

Delivery System Leveraging a Strategic Location

Their manufacturing facility is located near I-24 and Nashville, making it a highly strategic location well-suited for serving the Middle Tennessee region.

What types of projects is Performance Solutions LLC best for?

They have a proven track record of handling projects primarily in Tennessee, focusing on the fabrication of structural steel and steel stairs. Specific capabilities and lead times should be verified on a case-by-case basis.

This media also compares and introduces other recommended manufacturers by application. Use those guides as a reference when selecting the right product.

Performance Solutions LLC Installation Example

No examples of steel stairs were published on their official website.

Main Product Lineup

They accommodate the fabrication of steel stairs. Detailed specifications must be confirmed directly with the manufacturer.

Company Information

Company name Performance Solutions LLC
Headquarters address 6019 Seminary Rd, Smyrna, TN 37167
Phone number (615) 459-9104
Official website https://perfsolutions.com/
Find the Right Manufacturer by Stair Type

Compare manufacturers for egress, decorative, and industrial stair applications in the Ohio Valley.

For
Emergency
Egress Stairs
SY Stairs
SY Stairs capture
source : SY Stairs Official Website(https://systairs.com/)
  • A fully modular design with integrated handrails eliminates the need for on-site welding or specialized labor. Compared to traditional field-assembled systems, installation is over 70%* faster, allowing follow-on trades to start work much sooner.
  • Designed to meet building codes across the Ohio Valley, these stairs are ready for permanent use from day one. By eliminating the need for temporary ladders, they improve job site safety and accessibility.
Key
standards
OSHA, AISC, AWS, etc.
Typical
lead time
6 to 8 weeks
CAD data Available
For
Decorative
Monumental Stairs
American Stair
American Stair capture
American Stair Official Website (https://www.americanstair.com/)
  • With proprietary custom design, the company delivers complex circular, spiral, and cantilevered stairs, creating iconic staircases that become a building’s architectural focal point.

  • Advanced monumental stair solutions combine steel structures with materials such as glass, wood, and stone to deliver a refined, high-end finish with lasting strength.
Key
standards
IBC, OSHA, etc.
Typical
lead time
8 to 12 weeks
CAD data Available
For
Industrial
Dock Stairs
Upside Innovations
Upside Innovations capture
Upside Innovations Official Website(https://upsideinnovations.com/)
  • Crafted from industrial-grade aluminum, these stairs resist rust even in humid loading areas and outdoor installations. That helps maintain a clean appearance and dependable structural strength for long-lasting safety.

  • Bolt-on assembly means your stair can be installed in just a few hours with a forklift and a small crew, keeping your jobsite moving with minimal disruption.
Standards OSHA,ADA, etc.
Lead time Contact for details
CAD data Contact for details
*Based on SY Stairs' internal comparison between its modular pre-fabricated system and traditional field-assembled (stick-built) steel stair systems.
Results may vary depending on project scale, site conditions, and crew size.
*Information as of February 2, 2026